Built for the site. Clean enough for the client walk.
The day starts with a 6 a.m. pour and has an owner walkthrough at two. The crew wears a $17.02 printed tee and a 330 GSM hoodie with the mark stitched on the chest, and the estimator wears the same mark on an oxford. This is custom apparel and none of it is certified PPE.
One mark from slab to office
The Jobsite Set for a build season
The four pieces take a crew through a build season, from the 6 a.m. pour and the mid-day heat to the owner walkthrough and January. The tee below is priced with its chest print, and we send prices for the stitched hoodie, the stitched oxford and the beanie within one business day.
“The hoodies have been through a full winter of concrete and the logo still looks new. Our PMs wear the button-ups to bid meetings and we come across as a bigger outfit.”
How do we plan a crew order?
40 crew tees with the chest mark printed come to $680.80, and fifteen hoodies with the company name printed across the back add $359.40. Those 55 pieces total $1,040.20 at list and clear the 50-piece threshold, which takes 12% off everything. You pay $915.40 all-in, or $14.98 a tee and $21.08 a hoodie, with no setup fee. Caps for summer and beanies for January on the same order count toward 150 pieces, where the discount becomes 22%. Our company hoodies guide covers fleece weight and what survives a pressure washer.
- Your logo, as a vector file if you have one. If it only exists on a truck door, a clear photo works and our designers redraw it for thread.
- A headcount split into crew, foremen, PMs and office, because each group gets its own piece.
- Sizes, which each person enters through the share link. XS to 4XL are one price, so nobody has a reason to round down. The sizes and reorders guide shows how to keep the roster current.
- Where the mark goes. We suggest left-chest embroidery on everything and the company name printed across the back if it should read from the street, and the embroidery page shows how we embroider.
- The season start date. We tell buyers to begin 8 to 10 weeks out, because design and approval come first and move at your pace.